Electrical Load Studies

electrical load studies

Technical Ex Services can measure the most critical three-phase power parameters, we can log rms voltage, rms current, phase angle, voltage events, voltage and current THD, voltage and current harmonics up to the 50th, active power, reactive power, power factor, active energy, reactive energy, and more.

Applications

  • Load studies – verify electrical system capacity before adding loads
  • Energy assessments – quantify energy consumption before, and after improvements, to justify energy saving devices
  • Harmonics measurements –uncover harmonic issues that can damage or disrupt critical equipment
  • Voltage event capture – monitor or dips and swells that cause spurious resets or nuisance circuit breaker tripping

The test equipment can log data for up to 45 days, and can uncover intermittent or hard-to-find issues.
We will then download the data and generate a professional report displaying all recorded parameters on interactive trends.

Comments Off

Comments are closed.

Keep up to date with latest news at TExS... Follow us on 
© 2013 Technical Ex Services, all rights reserved.

Quick Contact

General (44) 01429 239559
Email info@texs.co.uk